Athens Metro Line 4 A
Construction of the line started in mid to late-2021 and is scheduled to be completed in 2029 or 2030
Construction of the line started in mid to late-2021 and is scheduled to be completed in 2029 or 2030
One Za’abeel by Ithra Dubai is an ambitious enterprise that combines the best in design, architecture and civil engineering…
On 1 March 2012 a contract was signed between Attiko Metro S.A. and a joint venture for the construction of the extension of Line 3 from Haidari to Piraeus, 7.6 km long with six stations. ..
On 2013 the extension to Elliniko was finished. 8km with 1 TBM
Recent Comments