Gold Line, Doha Metro
- Date: 2014 – 2018
- Client: ALYSJ JV
- Project Type: Metro Monitoring, Tunnel Monitoring
- Status: Completed
About
Focusing on the football world cup in 2022, Doha, Qatar launched the Doha Metro project. Most of the Doha Metro lines are underground, so tunneling plays a major role in construction. This ensures least disruption to life on the surface.
Instrumentation and monitoring of the alignment of the tunnel (13.5 km) and 10 stations, included online web data monitoring with automated monitoring as per requirement
The integration of data from 6 TBMs working simultaneously and 10 stations presented the biggest challenge of the Gold Line package, which was met successfully.
Read more about this project on the Encardio’s website: https://www.encardio.com/blog/doha-metro-case-study/
Latest Projects
Harry W. Nice Memorial Bridge
The Harry W.Nice Memorial Bridge runs between Newburgh in Charles County, Maryland and Dahlgren in King George Virginia, USA. It is a 2.7 km two-lane continuous truss bridge…
One Za’abeel
One Za’abeel by Ithra Dubai is an ambitious enterprise that combines the best in design, architecture and civil engineering…
Old Bridge of Konitsa, Epirus
The old bridge of Konitsa, Greece was built in 1869 and it has the traditional architecture of the single arc bridges…